Checked
Snow clearing priorities, sidewalks and driveways in St. John's, Newfoundland and Labrador
St. John's, Newfoundland and Labrador, Canada
St. John's clears streets within 24 hours after snowfalls up to 25 cm. Most sidewalks in its program are cleared within five days after a winter event ends.
Key information
St. John's clears streets within 24 hours after a snowfall of up to 25 cm, starting with major roads. Most sidewalks in the city's 193 km program are cleared within five days after a winter event ends, and driveways are the resident's job.

On this page
At a glance
| Item | What to know |
|---|---|
| Streets | Over 1,400 lane km |
| Sidewalks in program | 193 km |
| Snowfall up to 25 cm | Streets cleared within 24 hours after the storm |
| Larger storms | May take longer |
| Sidewalks | Most cleared within five days after the event ends |
| Ice control | One application on streets within three hours of ice conditions |
| Report a problem | 311 or 709-754-CITY (2489) |
Sources: Snow Clearing: Service Levels and Priority | City of St. John's · Snow Clearing | City of St. John's
In what order are streets and sidewalks cleared?
Streets are ranked mainly by traffic volume. Priority 1 is major and minor arterials. Priority 2 is collector streets. Priority 3 is local streets and cul-de-sacs. Priority 4 is private lanes the City maintains.
For sidewalks, school zones come first (Priority 1A). Next are the first side of arterial roads and the downtown business district. After that come the second side of multi-lane arterials and downtown, and the first side of collectors. The last levels are the second side of other arterials and collectors, and any remaining sidewalk sections.
You can look up your street at apps.stjohns.ca/snowclearing/StreetPriority.aspx or see the sidewalk map at map.stjohns.ca/sidewalk/. The Plow Tracker is at map.stjohns.ca/avl/.
Sources: Snow Clearing: Service Levels and Priority | City of St. John's
How long does it take?
For snowfalls up to 25 cm, streets are cleared within 24 hours after the storm. Snowfalls over 25 cm, blizzards and fast-changing weather can take longer. Drifting, rain or a sudden drop in temperature can also cause delays.
Most sidewalks in the program are cleared within five days after a winter event ends. This can be extended by more snow or ice. Crews work until all streets are cleared. Ice control is applied once on streets within three hours of ice conditions.
Sources: Snow Clearing: Service Levels and Priority | City of St. John's
What do I have to clear myself?
Driveway shovelling is the resident's responsibility. Plows can push snow into your driveway. You can move snow onto your own property rather than the road. The City suggests clearing the road side on the left of the driveway. Do not park on the sidewalk.
Clear snow and ice away from a nearby catch basin if it is safe, to reduce flooding. Canada Post clears around community mailboxes (1-866-607-6301). Metrobus clears bus shelters. Report an uncleared shelter at 709-722-9400.
Remove items that could get in the way of plows, such as hockey nets. Mark permanent structures with reflectors. Report excessive snow or ice in a driveway, or damage to property or garbage carts, to Access St. John's at 311 or 709-754-CITY (2489). Driveway complaints are reviewed after all streets and sidewalks are cleared.
Sources: Snow Clearing | City of St. John's
Questions and answers
How soon will my street be plowed?
After a snowfall of up to 25 cm, streets are cleared within 24 hours after the storm. Bigger storms may take longer.
Source: Snow Clearing: Service Levels and Priority | City of St. John's
Which streets are plowed first?
Priority 1 streets, which are major and minor arterials, come first. Local streets and cul-de-sacs are Priority 3.
Source: Snow Clearing: Service Levels and Priority | City of St. John's
How do I find my street's priority level?
Use the lookup at apps.stjohns.ca/snowclearing/StreetPriority.aspx.
Source: Snow Clearing: Service Levels and Priority | City of St. John's
Does the City clear sidewalks on my residential street?
The program covers 193 km, mostly on collector and arterial streets. Check the sidewalk map at map.stjohns.ca/sidewalk/.
Source: Snow Clearing: Service Levels and Priority | City of St. John's
How long do sidewalks take?
Most sidewalks in the program are cleared within five days after a winter event ends.
Source: Snow Clearing: Service Levels and Priority | City of St. John's
Who clears my driveway?
You do. Plows may push snow into driveways.
Who clears snow around community mailboxes?
Canada Post. Call 1-866-607-6301.
Who clears bus shelters?
Metrobus. Report an uncleared shelter at 709-722-9400.
Where do I report a snow problem?
Contact Access St. John's at 311 or 709-754-CITY (2489).
Can I park on the sidewalk during a storm?
No. The City asks residents not to park on the sidewalk.
Official service and next steps
Sources: Snow Clearing | City of St. John's · Snow Clearing: Service Levels and Priority | City of St. John's